ROAD WORK WEEKLY REPORT

 

(Thu., February 23, 2012) − Scheduled road work for the week beginning February 26, 2012, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below.  Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Rehabilitation of Streets, Phase 1 (aka IDIQ #2) – Honomanu St.

Paving Honomanu St.  Permanent striping, adjusting manhole and installing traffic detector loops to follow.

 

HAWAII KAI

Rehabilitation of Streets, Phase 1 (aka IDIQ #2) – Ainakoa Dr, Halekoa Dr, Hind Iuka Dr, Hao St, Kuliouou Rd, Keahole St, Kaluanui Rd, Kealahou St, Halemaumau St, Naio St, Kainui Dr.  Paving Halekoa Dr, Kealahou and Hao St.  Adjusting manholes and permanent striping to follow.

 

Repair Kalapaki Street Drainage Ditch Wall – Vicinity of 977 Kalapaki Street:  Removal and disposal of existing concrete ditch wall and slab.  Construction of new reinforced concrete ditch wall and slab.  Installation of new chain link fence.  Repair crack and spalled concrete on existing wall.

            (Estimated completion date, continuing through February 2012)

 

Kipu Ditch Storm Drainage Improvements – Vincinity of Kamiloiki Community Park and Kamiloiki Elementary School.  Reconstruction of existing drainage ditch; spall and delamination repairs along portion of drainage ditch; installation of new chain link fence; planting of new trees and biobarrier installation; tree and root pruning and removal of trees, shrubs and hedges for new drainage ditch.

            (Estimated completion date, March 2012)

 

Curb Ramps at Various Locations, FY 2010 (A) – Lunalilo Home Road between Hawaii Kai Dr. and Kalanipuu St.:  Construction of new curb ramps, sidewalks and A.C. pavement transition.  Relocation of existing regulatory/street signs. Adjustment of utility boxes.  Installation of pavement striping, markings and markers.

            (Estimated completion date, continuing through February 2012)

 

HONOLULU

Houghtailing Street Area Sewer Rehabilitation:  Installation and rehabilitation of sewer lines and construction of new manholes along School Street.

            (Estimated completion date, continuing through February 2012)

 

Kalakaua Avenue Sewer Rehabilitation:  Installation of new 8" and 10" sewer line along Kalakaua Avenue between Philip Street and Kapiolani.

            (Estimated completion date, continuing through February 2012)

 

Kalihi/Nuuanu Sewer Rehabilitation Phase 1J (Area 8 – Pacific Heights)  Rehabilitation of approximately 1,400 linear feet of 6" and 2,300 linear feet of 8" sewer lines by cured-in-place pipe (CIPP) method.  A number of deteriorated manholes will also be repaired.  Star Road, Pacific Heights Road, Laniloa Road, Booth Road, and Hiolani Place will be affected.  Construction signs and police traffic control will be present.

            (Estimated completion date, February 2013)

 

Rehabilitation of Streets, Phase 1 (aka IDIQ #2) – Kanewai St, Kaluawaa St, Kamakini St, Waiomao Rd, 8th Ave, 9th Ave, Paalea St, Kalua Rd, Mahana St, Kiwila St.  Finished paving Kanewai St, Kaluawaa St and Kamakini St. Adjusting manholes, permanent striping and detector loops to follow.

 

King Street Reconstruction between River Street and Bethel Street, Chinatown:  Rehabilitation of sewer lines and select laterals, sewer manhole frame and cover replacement, excavation; Installation and backfill for new 6", 8" & 12" water lines, fire hydrants, valves, manholes; Installation and backfill for new 6" drain lines, inlets and manhole connections; Excavation and backfill for new gas lines; Demonish existing concrete and A.C. pavements to install new work and adjust manholes & valves boxes to grade. Work will include portions of River Street, Kekaulike Street, Maunakea Street, Smith Street, Nuuanu Street and Bethel Street where they intersect with King Street. Multiple lane closures Monday thru Friday, 8:30 a.m. to 3:30 p.m.

            (Estimated completion date, May 2013)

 

Miscellaneous Drainage Improvements at Various Locations – Lokahi Street (McCully)  Construct concrete drain inlets, concrete drain catch basins, connect to existing drain line, and install drain pipes.

            (Estimated Completion Date, continuing through February 2012)

 

Mokauea Street Improvements between North King Street and Dillingham Boulevard:  Reconstruction concrete curbs and gutters, driveway and some sidewalks; construct new curb ramps; reconstruct and resurface asphalt roadway.  Reconstruction of shallow drain line across Akina Street added.  Post paving activities include installation of permanent pavement markings, adjust utilities to finish grade, and re-install traffic loop detectors.

            (Estimated Completion continuing through February 2012)

 

Rehabilitation of Streets, Phase 1 (aka IDIQ #2) – Naio St.

Paving Naio St.  Permanent striping, adjusting manhole and installing traffic detector loop to follow.

 

Highway Structure Improvements, Pacific Heights Road Retaining Wall, Vicinity of 2210 Star Road

Removal and reconstruction of approximately 227 L.F. of concrete retaining wall with stone veneer facing; relocate joint utility poles and electrical lines for wall construction; replace existing electrical poles with new poles and lines; relocate existing streetlight fixtures on temporary poles for wall construction; install new streetlight fixtures on new poles; restore AC pavement fronting new wall; restore pavement markings and markers; relocate existing signs and posts; provide traffic controls during working and non-working hours.

            (Estimated completion date, January 2013)

 

Curb Ramps at Various Locations, FY 2009 (B), Palolo and Kaimuki:  Construction of new curb ramps, sidewalks and A.C. transition.  Relocation of existing regulatory/street signs. Installation of pavement striping, markings and markers.

            (Estimated completion date, continuing through February 2012)

 

Queen Street Roadway Improvements – Queen Street, Diamond Head side of Queen Street and Punchbowl Street intersection:  Demolition and reconstruction of existing concrete bus pad, curb ramps, sidewalk, curb and gutter, and thru gutter.  Cold planing, resurfacing and reconstruction of A.C. pavement.  Adjustment of utility manhole frames and covers.  Installation of pavement striping, markings and markers.

            (Estimated completion date, continuing through February 2012)

 

Saint Louis Heights Sewer Rehabilitation:  Installation of cured in place pipe (CIPP), manhole rehabilitation, and lateral rehabilitation throughout Saint Louis Heights.  The contractor will also install new sewer lines via pipe bursting at 3 locations along Saint Louis Drive and one easement location between Saint Louis Drive and Frank Street.

            (Estimated completion date, continuing through February 2012)

 

Rehabilitation of Streets, Unit 54 – Wilhelmina Rise, 13th Avenue to Matsonia Street  The work includes demolition and reconstruction of the existing PCC pavement and curbs identified on the plan.  Tree trimming, pruning and removal will be performed as necessary and as identified on the plan.  Adjustment of manholes and frames to grade as necessary; post paving activities include permanent pavement markings

            (Estimated Completion July 2012)

 

Wilhelmina Rise Sewer Rehabilitation:  Installation of cured in place pipe (CIPP), lateral rehabilitation, and replacement of sewer lines by open trench.

            (Estimated completion date, continuing through February 2012)

 

KAILUA

Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 – Aikahi Park.  The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops.  Slurry seal completed.  Kaneohe Bay Drive repair completed.

            (Estimated completion date, June 2013)

 

Curb Ramps at Various Locations, FY 2010 (A) – Hele St./Liku St., Hele St./Mowai St., Hele St./Kina St., Kina St./Loho St., Kina St./Kupau St., Apokula St./Apokula Pl., Apokula St./Kupau St., Kuloaa Pl./Kupau St., Kupau St./Kupau Pl., Hele St./Loho St., and Hele St./Mapuana St.:  Construction of new curb ramps, sidewalks and A.C. pavement transition.  Relocation of existing regulatory/street signs. Adjustment of utility boxes.  Installation of pavement striping, markings and markers.

            (Estimated completion date, continuing through February 2012)

 

KANEOHE

Flood Control Improvements at Various Locations FY 2008 – Kaneohe, Kailua & Waipio:  Demolish and reconstruct new concrete and asphalt concrete ramps and driveways.  Repair existing concrete ditch and adjust utility frames, covers and boxes to finish grade.

            (Estimated completion date, continuing through February 2012)

 

Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 – Kaneohe: Mokulele Dr and Kaneohe Bay Dr.  The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops.  Slurry seal at Mokulele Drive completed.

            (Estimated completion date, June 2013)

 

Miscellaneous Storm Drainage Improvements at Wailele Road Outlet:  Construction of a new 6' x 5' box culvert, drop manhole, impact-stilling basin, and concrete pavement; waterline relocation; installation of 6' and 4' chain link fencing and gates, and metal guard rail.

            (Estimated completion date, February 2012)

 

MAKAKILO

Curb Ramps at Various Locations, FY 2010 (A) – Anipeahi St./Palailai St.:  Construction of new curb ramps, sidewalks and A.C. pavement transition.  Relocation of existing regulatory/street signs. Adjustment of utility boxes.  Installation of pavement striping, markings and markers.

            (Estimated completion date, continuing through February 2012)

 

Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 – Honokai Hale.  The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops.  Slurry seal completed.

            (Estimated completion date, June 2013)

 

NUUANU

Rehabilitation of Kimo Drive Bridge Over Nuuanu Stream, Bridge No. 260  Repair of spalls, concrete guardrails and bridge girders.

            (Estimated completion date, continuing through February 2012)

 

PEARL CITY

Rehabilitation of Streets, Phase 1 (aka IDIQ #2) – Oa St., Pahemo St, Lii Ipo St, Lokowai St, Lokowai Pl, Kanuku Pl, Kanuku St, Olepe Lp, Pahemo Pl, Hekaha St, Honomanu St, Pono St, Ponohale St, Ponohana Lp, Ponokaulike St, Ponokawila Pl, Ponokawila St and Kauhale St intersection.  Resurfacing Hekana St, Kanuku St, & Lii Ipo St

            (Estimated completion date, May 2012)

 

PEARLRIDGE

Rehabilitation of Streets, Unit 51 – Moanalua Road, Kaahumanu Street, Hoomaemae Street, and Hoomalu Street:  Cold planing; excavation of existing asphalt concrete pavements; resurfacing and reconstruction of asphalt concrete pavements; portland cement concrete pavements; reconstruction of existing concrete curbs and/or gutters; arboricultural work; repair of catch basins; adjustment of utility manhole frames and covers; installation of pavement markings; vehicle detector loop installation; and traffic control.

            (Estimated completion date, July 2012)

 

WAHIAWA

Rehabilitation of Streets, Unit 58 – California Avenue (Kamehameha Highway to mauka end of California Avenue):  Cold planing; resurfacing and reconstruction of asphalt concrete pavement; adjustment of utility manhole frames and covers; installation of pavement markings and vehicle loop detectors; reconstruction of existing concrete curbs, gutters, berms, sidewalks and Driveways; and construction of concrete and asphalt concrete bus pads.

            (Estimated completion date, March 2012)

 

WAIANAE

Mailiili Stream Flood Control Improvements – Near Halona Road and Puuhulu Road:  Removal and reconstruction of damaged concrete channel lining, construction of new channel access ramp near Halona Road Bridge, and construction of overflow side-drains on the channel banks.

            (Estimated completion date, continuing through February 2012)

 

WAIKIKI

Beachwalk Force Main Phase I:  2 Staging pits to be constructed along Ala Wai Boulevard from Kalakaua towards Ala Moana Boulevard for the microtunneling installation of new sewer line.

            (Estimated completion date, continuing through February 2012)

 

Curb Ramps at Various Locations, FY 2010 (A) – Paoa Place (Hilton Hawaiian Village Third Driveway):  Construction of new curb ramp and A.C. pavement transition.

            (Estimated completion date, continuing through February 2012)

 

PARADES, WALKS, RACES AND OTHER STREET CLOSURES

 

February 26, 2012 Sunday
7:00AM Starts
10:00AM Ends

MAKAHA BEACH TIME TRIAL sponsored by Cambiamento d'Andaturo.  The event is expected to have 75 participants.  It will start at Kaena Point State Park, to Farrington Hwy., turnaround at Makaha beach, to loop at end at Kaena Pt. State Park.  Contact:  David Lum 429-9475, Fax:  839-2094, E-mail:  rhombus01@msn.com 

 

 March 2, 2012 Friday
7:30PM Starts
1:00AM Ends

FIRST FRIDAY STREET FESTIVAL sponsored by Arts District Merchant Association. The event is expected to have 1,000+ participants.  The event will close HOTEL ST., all traffic lanes/sidewalk areas, from Smith St to Nuuanu Ave.   Contact:  Eric Walden 271-3094,  For more info, visit their website:  http//www.artsdistricthonolulu.com

 

  March 3, 2012 Saturday
6:00AM Starts
11:00AM Ends

HALEIWA TRIATHLON sponsored by North Shore Triathlon. The event is expected to have 200 triathletes.  Swim will be offshore of Halewia Beach Park. Bike race will start at Haleiwa Beach Park transition area, to Kamehameha Hwy., to Joseph Leong by pass road, to Weed Junction, to Kamehameha Hwy., to loop around 2 more times on same course, end at Haleiwa Beach Park transition area. Run will start at transition area, to Police beach along coast, to Eco Camp, to turnaround, to end at Haleiwa Beach Park. Contact: Chris Gardner 372-8885  Email: northshoretriathlon@gmail.com

 

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 768-8839, Wastewater Management Division, Construction Management - 768-8794, Department of Transportation Services, TST Division 768-8391.