February 16, 2011 ROAD WORK WEEKLY REPORT Scheduled road work for the week beginning February 20, 2011, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below. Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted. AIEA Aiea Heights Drive Emergency Roadway Improvements: Work includes road/slope stabilization and pavement resurfacing/rehabilitation (incl. installation of metal guardrail and plastic lumber lagging) below Analio Place and above the horseshoe turn. (Estimated completion date, May 2011) Local Rehabilitation of Streets, Phase 1 (IDIQ#2). Paving Keeamoku St. from Kaihee St to Mauka End and Kalihi St from Maliu St to Mauka End. AINA HAINA Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 Aina Haina: The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops. Hind Iuka Dr from Mona St to End slurry seal is done. (Estimated completion date, June 2013) EWA Miscellaneous Drainage Improvements at Various Locations (Pohakupuna Road). Construct additional drain manholes on the existing drain line. (Estimated completion date, May 2011 HONOLULU Rehabilitation of Secondary Streets at Ala Wai: The project includes excavating, reconstructing and resurfacing asphalt concrete pavements and base; providing smooth lateral transitions at all streets and driveways; reconstructing base at bus stop locations; adjusting street monuments, utility manhole frames and covers; installing pavement markings; reconstructing existing asphalt concrete berms with drainage openings. The affected roadways and limits of work are as follows: Kapiolani Boulevard: From Date Street to South King Street is being paved. Isenberg Street: From Kapiolani Boulevard to Bingham Street, paving completed. (Estimated completion date, February 2011) Amelia Street Relief Sewer Amelia Street and adjoining School Street: Installation of a new 16" sewer line underground along Amelia Street and portion of School Street at Amelia Street (Estimated completion date, February 2011) Iwilei Road and North King Street Drainage Improvements Intersection of Iwilei Road and North King Street: Repair 18-inch and 12-inch drain lines, pavement restoration work, curb, gutter and sidewalk restoration, striping, and pavement marking restoration, the construction of sewer jackets and the reconstruction of a curb ramp flare. (Estimated completion date, June 2011) Rehabilitation of Localized Streets, Phase 5A Kahala to Kaimuki Area Post Paving Activities in-progress. The work includes permanent pavement markings and adjustment of utility manhole frames and covers to grade. The affected roadways and limits of work are as follows: 18th Avenue, from Harding Avenue to Diamond Head Road, 19th Avenue, from H-1 Freeway to Kilauea Avenue including TMK: 32039051, 20th Avenue, from H-1 Freeway to Kilauea Avenue, 21st Avenue, from Harding Avenue to Kilauea Avenue, 22nd Avenue, from Harding Avenue to End, Ahakea, Street, from Aukai Avenue to Elepaio Street, Ahina Street, from Ahakea Street to Aukai Avenue, Ahuli Place, from Pahoa Avenue to End, Alae Street, from Elepaio Street to Onaha Street, Amau Street, from Hunakai Street to Pueo Street, Apuwai Place, from Kilauea Avenue to End, Aukai Avenue, from Kealaolu Avenue to Kahala Avenue Elepaio Street, from Kilauea Avenue to Kahala Avenue, Farmers Road, from Kealaolu Avenue to Ulumaika Street, Hakaka Place, from Hakaka Street to End, Hakaka Street, from Palekaua Street to End, Honua Street, from Onaha Street to Kolohala Street, Hopeloa Place, from Puu Panini Avenue to End, Huanui Place, from Huanui Street to End, Huanui Street, from 22nd Avenue to Puu Panini Avenue including TMK: 32061018, Hunakai Street, from Waialae Avenue to Kahala Avenue, Hunalewa Street, from 22nd Avenue to Huanui Street, Hunapaa Street, from Huanui Street to End, Iiwi Street, from, Onaha Street to Kolohala Street, Ipo Place, from 22nd Avenue to End Kaalawai Place, from Diamond Head Road to End, Kaikoo Place, from Papu Circle to End, Kaikuono Place, from Papu Circle to End, Kaimanahila Street, from Paikau Street to Hakaka Street, Kaimuki Avenue, from 18th Avenue to Luawai Street, Kala Place, from Aukai Avenue to Kahala Avenue, Kaualio Place, from 22nd Avenue to End, Kealaolu Place, from Kealaolu Avenue to End, Koae Place, from Koae Street to End, Koae Street, from Hunakai Street to Amau Street, Koloa Street, from Kahala Avenue to Elepaio Street, Kolohala Street, from Onaha Street to Elepaio Street, Kuana Street, from Onaha Street to Kolohala Street, Kulamanu Street, from Kahala Avenue to Kulamanu Place Luakaha Place, from Luakaha Street to End, Luakaha Street, from Luawai Street to End, Luawai Place, from Luawai Street to End, Luawai Street, from 20th Avenue to Pahoa Avenue, Makaiwa Street, from Kilauea Avenue to Pueo Street, Makalike Place, from 22nd Avenue to End, Malapua Place, from 22nd Avenue to End, Maunaloa Avenue, from 18th Avenue to 22nd Avenue, Moa Street, from Pueo Street to Makaiwa Street, Noio Street, from Onaha Street to Kolohala Street, Onaha Street, from Kilauea Avenue to Kolohala Street Pahoa Avenue, from Kilauea Avenue to Moa Street and from 18th Avenue to 22nd Avenue, Paikau Street, from 22nd Avenue to Kahala Avenue, Palekaua Place, from Palekaua Street to End, Palekaua Street, from Puu Panini Avenue to Hakaka Street, Pana Place, from Paikau Street to End, Panini Loop, from Puu Panini Avenue to Puu Panini Avenue, Pilialo Street, from Luawai Street to Kaimuki Avenue Poka Place, from Poka Street to End, Poka Street, from Paikau Street to Diamond Head Road, Pokapahu Place, from Paikau Street to End, Pueo Street, from Kahala Avenue to Hunakai Street, Puulani Place, from Hunakai Street to End, Puu Panini Avenue, from Kilauea Avenue to 22nd Avenue, Ulili Street, from Onaha Street to Kahala Avenue, Ulumaika Street, from Hunakai Street to Hunakai Street, Ulupua Place, from 22nd Avenue to End, Waikui Street, off Kalanianaole Highway, Waiohinu Drive, from Makaiwa Street to Makaiwa Street (Estimated Completion January 2011) Rehabilitation of Localized Streets, Phase 5B Kaimuki, Diamond Head and Kapahulu Areas The work includes localized reconstruction of pavement and resurfacing of the streets indicated below; reconstruction of curbs, gutters, sidewalks and driveways are included; tree trimming, pruning and removal will be performed as necessary; post paving activities include permanent pavement markings and adjustment of utility manhole frames and covers to grade. The affected roadways and limits of work are as follows: Aloalo Place, from Harding Avenue to End; Alohea Avenue, from 6th Avenue to Makapuu Avenue; Belser Street, from Kaimuki Avenue to Harding Avenue; Bethshan Road, from 12th Avenue to End Brokaw Street, from Kanaina Avenue to Alohea Avenue; Campbell Avenue, from Monsarrat Avenue to Collins Street; Castle Street, from Kanaina Avenue to 6th Avenue; Catherine Street, from Kanaina Avenue to Alohea Avenue; Charles Street, from Kapahulu Avenue to 4th Avenue; Coconut Avenue, from Kalakaua Avenue to Hibiscus Drive; Collins Street, from Campbell Avenue to Kepa Street Crater Place, from Crater Road to End; Crater Road, from 12th Avenue to End Diamond Head Circle, from Monsarrat Avenue to End; Diamond Head Road, from Poni Moi Street to Beach Road; Duval Street, from Kanaina Avenue to Upper Street; Edna Street, from Trousseau Street to Alohea Avenue; Ekela Avenue, from Date Street to End; Esther Street, from Kanaina Avenue to Upper Street; Francis Street, from Kanaina Avenue to Alohea Avenue; George Street, from Campbell Avenue to Alohea Avenue; Hayden Street, from Campbell Avenue to Alohea Avenue; Herbert Street, from Kapahulu Avenue to 6th Avenue; Hibiscus Drive, from Poni Moi Street to Coconut Avenue Hinano Street, from Campbell Avenue to Trousseau Street; Holei Street, from Leahi Avenue to Noela Street; Hoolulu Street, from Kapahulu Avenue to 6th Avenue; Hunter Street, from Kapahulu Avenue to Winam Avenue James Street, from Upper Street to Alohea Avenue; Kaimuki Avenue, from Kapiolani Boulevard to 4th Avenue and from 6th Avenue to 18th Avenue; Kalakaua Avenue, from Poni Moi Street to Coconut Avenue; Kamuela Avenue, from Date Street to Kapahulu Avenue; Kana Place, from Ocean View Drive to End; Kanaina Avenue, from Kaunaoa Street to Monsarrat Avenue and from Monsarrat Avenue to Private Section; Kaunaoa Street, from Leahi Avenue to Trousseau Street; Kepa Street, from Wauke Street to Collins Street; Kepuhi Street, from Trousseau Street to Alohea Avenue; Kiele Avenue, from Poni Moi Street to Coconut Avenue; Kikeke Avenue, from Pahoa Avenue to H-1 Freeway End and from Pahoa Avenue to H1 Freeway End; Kilauea Avenue, from 6th Avenue to 3812 Kilauea Avenue; Kokohead Avenue, from Pahoa Avenue to 12th Avenue and from Waialae Avenue to Harding Avenue; Leialoha Street, from Olokele Avenue to End Lincoln Avenue, from Kapahulu Avenue to 6th Avenue; Lukepane Avenue, from Date Street to Leialoha Street; Mahina Avenue, from Kokohead Avenue to 15th Avenue; Makaleka Avenue, from Date Street to End; Makapuu Avenue, from Diamond Head Road to Kilauea Avenue; Makini Street, from Campbell Avenue to Trousseau Street; Malie Place, from Pokole Street to End; Martha Street, from Campbell Avenue to 6th Avenue; Maunalei Avenue, from 9th Avenue to Makapuu Avenue Maunaloa Avenue, from 6th Avenue to 18th Avenue; McCorriston Street, from Trousseau Street to Alohea Avenue; Mokihana Street, from Kapahulu Avenue to 4th Avenue Nikolo Street, from Holei Street to Noela Street; Noela Street, from Paki Avenue to End; Ocean View Drive, from Pahoa Avenue to Kilauea Avenue; Olokele Avenue, from Date Street to End; Olu Street, from Kapahulu Avenue to 4th Avenue; Owena Street, from Holei Street to Noela Street; Paahana Street, from Maunaloa Avenue to Kaimuki Avenue; Pahoa Avenue, from Kokohead Avenue to 18th Avenue; Palani Avenue, from Date Street to Winam Avenue; Palima Place, from Pahoa Avenue to 4th Avenue; Paliuli Street, from Kapahulu Avenue to 4th Avenue; Pokole Street, from Alohea Avenue to Kilauea Avenue; Poni Moi Road, from Paki Avenue to Hawaii School for Girls Entrance; Pualei Circle, from Leahi Avenue to End Sunset Avenue, from 12th Avenue to Kilauea Avenue; Sunset Place, from Sunset Avenue to End; Trousseau Street, from Wauke Street to Monsarrat Avenue and from Diamond Head Road to End; Upper Street, from Duval Street to James Street; Wauke Street, from Campbell Avenue to Trousseau Street; Wela Street, from Trousseau Street to Alohea Avenue; Williams Street, from Kapahulu Avenue to Winam Avenue; Winam Avenue, from Hayden Street to Olokele Avenue 1st Avenue, from Waialae Avenue to Harding Avenue; 2nd Avenue, from Waialae Avenue to Lincoln Avenue; 3rd Avenue, from Waialae Avenue to Kaimuki Avenue; 4th Avenue, from Paliuli Street to Winam Avenue; 5th Avenue, from Pahoa Avenue to H-1 Freeway; 6th Avenue, from Pahoa Avenue to Alohea Avenue; 7th Avenue, from Pahoa Avenue to Alohea Avenue; 8th Avenue, from Pahoa Avenue to Alohea Avenue; 9th Avenue, from Pahoa Avenue to Maunalei Avenue; 10th Avenue, from Maunalei Avenue to Alohea Avenue; 11th Avenue, from Pahoa Avenue to Kilauea Avenue; 12th Avenue, Pahoa Avenue to Alohea Avenue; 13th Avenue, from 150' makai of Waialae Avenue to Pahoa Avenue; 14th Avenue, from 150' makai of Waialae Avenue to Kaimuki Avenue; 15th Avenue, from Waialae Avenue to Harding Avenue and H-1 Freeway to Kilauea Avenue; 16th Avenue, from Waialae Avenue to Kilauea Avenue; 17th Avenue, from H-1 Freeway to Kilauea Avenue (Estimated Completion November 2011) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1A and 1C: New sewer line and manhole installation on Dillingham Blvd, Puuhale Road, Mokauea Street, and Kalihi Street. Lane closures Monday thru Friday, 8:30 a.m. to 3:30 p.m. (Estimated completion date, February 2011) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1B: New sewer line and manhole installation on Akina and Kaili Street. Lane Closures Monday thru Friday, 8:30 a.m. to 3:30 p.m. (Estimated completion date, February 2011) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1D: New sewer line and manhole installation on Booth Road and Prospect Street. Lane Closures Monday thru Friday, 8:30 a.m. to 3:30 p.m. (Estimated completion date, February 2011) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1G: New sewer line, manhole installation and sidewalk restoration on Kuakini Street (between Nuuanu Avenue and Pali Highway) is ongoing. Lane closures Monday thru Friday, 8:30 a.m. to 3:30 p.m. (Estimated completion date, February 2011) Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 Kapahulu: 4th ave, 5th ave, Hookipa Way, Pahoa Ave, Kaimuki Ave, Olu St, Mokihana St, Paliuli St and Charles St. and Kulamanu Pl. The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops. Olu St from 4th ave to 6th ave, Mokihana St from 4th ave to Mooheau ave and Kulamanu Pl from Kulamanu St to End are done. (Estimated completion date, June 2013) Rehabilitation of Secondary Streets at Makiki - Kinau St from Alapai St to Waiau Pl, Wilder Ave from Spencer St to Dole St. and Dole St from Wilder Ave to St. Louis Dr.: The project will demolish, remove and dispose of existing pavements in Honolulu area. Resurface or reconstruct these streets with asphalt concrete pavement. Adjust manholes and monuments to road grades. Restore all pavement striping, markings and markers. Collect GPS data on manholes, street monuments, valve boxes, fire hydrants, and other features as directed by the City before construction begins. Work is currently being done on Wilder Avenue near the Punahou Intersection. (Estimated completion date, March 2011) Mapunapuna Industrial Subdivision Phase One of Tidal Flooding Remediation Program. Remove existing flap gates and install new check valves at outlet pipes in State channel fronting Kam Highway. Construct new DMH upstream of new check valves. Re-grade swale and adjust DI to provide positive drainage into existing drain system. Upgrade concrete wall at outlet pipes at State channel. Remove debris and sediment from existing storm drains and channel area. Dewater State channel and install temporary dewatering dams. At the intersection of Ahua Street and Awaawaloa Street, abandon existing storm drain on Ahua Street and install new storm drain MH on upstream end of abandoned pipe. (Estimated completion date, February 2011) Mokauea Street Improvements between North King Street and Dillingham Boulevard: Reconstruction concrete curbs and gutters, driveway and some sidewalks; construct new curb ramps; reconstruct and resurface asphalt roadway. Post paving activities include installation of permanent pavement markings, adjust utilities to finish grade, and re-install traffic loop detectors. (Estimated Completion April 2011) Curb Ramps at Various Locations, FY 2009 (B), Palolo and Kaimuki: Construction of new curb ramps, sidewalks and A.C. transition. Relocation of existing regulatory/street signs. Installation of pavement striping, markings and markers. (Estimated completion date, June, 2011) Rehabilitation of Secondary Streets at Kaimuki Palolo Avenue; Pahoa Avenue, 8th Avenue to Kokohead Avenue, 22nd Avenue to Kilauea Avenue; Kapahulu Avenue, Paki Avenue to Kalakaua Avenue; Paki Avenue, Kapahulu Avenue to Poni Mei Street. Paving completed, working on manhole adjustments. (Estimated completion date, February 2011) Peterson Lane and Pua Lane Sewer Rehabilitation: New sewer line and manhole installation in complete on King Street (between Dillingham Blvd. and Peterson Lane), Pua Lane and Peterson Lane. Repaving of King, Peterson and Pua Lane is complete. Punchlist items and reconstruction of Tamashiro Market driveway remain. One lane in each direction will be closed Monday thru Friday, 8:30 a.m. to 3:30 p.m. (Estimated completion date, February 2011) Punchbowl Street and Lusitana Street Drainage Improvements: The work consists of drainlines and manholes rehabilitation with Cast-in-place-pipe (CIPP) in Punchbowl Street, and 24-inch drainline and curb replacement in Lusitana Street. One lane road closure will be limited to 8:30 a.m. to 3:30 p.m., Monday thru Friday, except for County furlough and holidays. (Estimated completion date, February 2011) Saint Louis Heights Sewer Rehabilitation: Installation of cured in place pipe (CIPP), manhole rehabilitation, and lateral rehabilitation throughout Saint Louis Heights. The contractor will also install new sewer lines via pipe bursting at 3 locations along Saint Louis Drive and one easement location between Saint Louis Drive and Frank Street. (Estimated completion date, February 2011) Wilhelmina Rise Sewer Rehabilitation: Installation of cured in place pipe (CIPP), lateral rehabilitation, and replacement of sewer lines by open trench. (Estimated completion date, February 2011) KAILUA Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 Aikahi Park. The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops. Slurry seal is in process. (Estimated completion date, June 2013) Kalaheo Avenue/Mokapu Road/Aikahi Loop Sewer Rehabilitation: Installation of Cured In Place Pipe along Mokapu Boulevard, from the intersection of Mokapu and Kalaheo, and Aikahi Loop. (Estimated completion date, February 2011) Rehabilitation of Kawailoa Road Bridge over Kaelepulu Stream, Bridge No. 411: Work includes repair of spalls in the concrete elements; replacement of the deteriorated pedestrian walkway and railing at the upstream side of the bridge; repair of deck joints; replacement of the vehicular guardrail system; and traffic safety improvements at the bridge approaches. Final inspection was performed on December 14, 2010 and the contractor is doing punch list work. (Estimated completion date, February 2011) Rehabilitation of Streets, Unit 52 Keolu Drive (Kalanianaole Highway to Akahai Street); Keolu Drive (Akaakaawa Street to Wanaao Road): Cold planing; resurfacing and reconstruction of asphalt concrete pavements (ACP); adjustment of utility manhole frames and covers; installation of pavement markings and vehicle loop detectors; reconstruction of existing concrete curbs, gutters, sidewalks and Driveways; reconstruction of concrete catch basins; and construction of concrete and asphaltic concrete bus pads. (Estimated completion date, February 2011) Wanaao Road/Keolu Drive Reconstructed Sewer: Installation of new sewer line along Wanaao Road between Hahani Street and Aoloa Road. (Estimated completion date, February 2011) KANEOHE Rehabilitation of Kamehameha Highway Bridge Over Heeia Stream Kamehameha Highway in Heeia: Repair of concrete delamination, spalls and cracks on existing bridge structure; removal and replacement of sidewalk platform; painting of the bridge parapet, chain link fence, and sidewalk's steel structure. (Estimated completion date, June 2011) Flood Control Improvements at Various Locations FY 2008 Kaneohe, Kailua & Waipio: Demolish and reconstruct new concrete and asphalt concrete ramps and driveways. Repair existing concrete ditch and adjust utility frames, covers and boxes to finish grade. (Estimated completion date, May, 2011) Kaneohe Bay Drive Trunk Sewer Reconstruction: Installation of new sewer lines, new manholes, and cured in place pipe (CIPP). Work will occur on Kaneohe Bay Drive between Mokapu Road and Kuono Place, Kaimalu Place and Way, Ikeanani Drive, and Kuakoa Place. (Estimated completion date February 2011) Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 Kaneohe: Mokulele Dr and Kaneohe Bay Dr. The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops. Slurry seal is in process. (Estimated completion date, June 2013) MAKAKILO Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 Honokai Hale. The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; aboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops. Crack sealing is in process. (Estimated completion date, June 2013) MANOA Manoa Valley Drainage Improvements at 3088 and 3090 Kahewai Place: Removal of existing concrete headwall and drain pipe, installation of new drain manhole and 18" RCP drain pipe, and construction of CRM drain outlet structure and base. (Estimated completion date, February 2011) Miscellaneous Drainage Improvements at Various Locations (Loulu Street). Construct concrete drain inlets, connect to existing catch basin, and install drain pipes and cleanouts. (Estimated completion date, February 2011) NUUANU Rehabilitation of Kimo Drive Bridge Over Nuuanu Stream, Bridge No. 260 Repair of spalls, concrete guardrails and bridge girders. (Estimated completion date, February 2011) PALOLO Rehabilitation of Secondary Streets at Kaimuki Palolo Avenue, Waialae Avenue to 10th Avenue in Palolo Valley. Paving completed, working on manhole adjustments. (Estimated completion date, February 2011) PEARL CITY Rehabilitation of Secondary Streets at Pearl City Hoolaulea Street below Moanalua Road (Waimano Home Road to Hoomoe Road), Nanakai Place (Nanakai Street to end), Nanakai Street (Waimano Home Road to Hoomalu Street), Puu Kipa Street ( Nanakai Street to Nanakai Street): Paving completed. Punch list for manhole adjustment remaining. (Estimated completion date, February 2011) Manana Infrastructure Improvements, Phase VI Connector Road (Kuala Street to Kuahaka Street) Construct 60-foot wide roadway from Kuala Street to Kuahaka Street. The work includes, vector control; clearing, grubbing and grading; installation of new storm drain, Heco, Hawaiian Telcom, street light and traffic signal systems; concrete slab protection for existing sewer and water lines; grade adjustments in private lots; new noise and retaining walls, chain link fence and gates: reconstruction of existing drain, water and sewer MHs and valves to new finish grade; installation of curbs, gutters, sidewalks, driveways, curb ramps and sidewalk culverts; installation of irrigation system and landscape improvements; tree removal and pruning in private lots; road paving; pavement markings and markers and street signs. (Estimated completion date, February 2011) Waimalu Sewer Rehabilitation/Reconstruction Phase I: Installation of new sewer lines/man holes and reconnection of existing sewer laterals along Hekaha, Kanuku, Lokowai, Lii-Ipo, Pahemo, and Olepe. (Estimated completion date, February 2011) Protective Chain Link Fencing at Various Locations, FY-04 Waimano Home Road: Removal and replacement of CMU wall, guardrails and chain link fence. (Estimated completion date, March 2011) PEARLRIDGE Rehabilitation of Secondary Streets at Pearl City Kaonohi Street ( Kaonohi Place to entire loop), and Kaonohi Street (Kamehameha Highway to Moanalua Road): Paving completed. Punch list for manhole adjustment remaining. (Estimated completion date, February 2011) PUPUKEA Pupukea Road Rockfall Mitigation Phase I Pupukea, Oahu: The work consists of clearing vegetation within the project limits, scaling boulders and unstable rocks or installing rock dowels (where appropriate), applying shotcrete (where required), installing rock fall protection fences, drapery system and landscaping. One traffic lane will be closed during work hours at Pupukea Road with police performing traffic control duties. Actual construction work will start on Monday March 14, 2011. (Estimated completion date, August 2011) SALT LAKE Protective Chain Link Fencing at Various Locations, FY-04 Luaole Street: Removal of damaged fence and installation of new chain link fence and posts. (Estimated completion date, March 2011) Rehabilitation of Streets, Phase 1 (aka IDIQ #2) Ala Mahamoe St, Ala Lilikoi St, Ala Napunani St, Salt Lake Blvd, Kanewai St, Kaluawaa St, Kamakini St, Waiomao Rd, Ala Alii St, Anapa St, Haloa Sr, Halupa St, Holapa St, Kukila Pl, Kukila St, Laakea Pl, Laakea St, Lehia St, Loina Pl, Luapele Dr, Luapele Pl, Mahie Pl, Mahie St, Molehu Dr, Molina St, Naulu Pl, Olaloa St, Olino St, Opua St, Palahinu Pl, Piikea Pl, Piikea St, Puanakau St, Ukali St, Uila St, Wawe Pl, Kahikolu Pl, Kahikolu Way, Likini St, Makaala St, Manuwa Dr, Miko St, Pakini St, Ukana St, Wanaka St. Currently paving Ala Mahamoe St. WAHIAWA Rehabilitation of Streets, Unit 58 California Avenue (Kamehameha Highway to mauka end of California Avenue): Cold planing; resurfacing and reconstruction of asphalt concrete pavement; adjustment of utility manhole frames and covers; installation of pavement markings and vehicle loop detectors; reconstruction of existing concrete curbs, gutters, berms, sidewalks and Driveways; and construction of concrete and asphalt concrete bus pads. (Estimated completion date, December 2011) WAIANAE Mailiili Stream Flood Control Improvements Near Halona Road and Puuhulu Road: Removal and reconstruction of damaged concrete channel lining, construction of new channel access ramp near Halona Road Bridge, and construction of overflow side-drains on the channel banks. (Estimated completion date, July 2011) Mailiili Stream Restoration Near Mailiili Road: Removal of fill material including concrete rubble, uncompacted material, asphalt concrete, etc., removal of access ramp, installation of erosion control blanket on stream banks, and planting of channel bed with wetland vegetation. Implementation, maintenance and removal of BMPs. (Estimated completion date, February 2011) WAIKIKI Rehabilitation of Secondary Streets at Kaimuki Palolo Avenue; Pahoa Avenue, 8th Avenue to Kokohead Avenue, 22nd Avenue to Kilauea Avenue; Kapahulu Avenue, Paki Avenue to Kalakaua Avenue; Paki Avenue, Kapahulu Avenue to Poni Mei Street. Paving completed, working on manhole adjustments. (Estimated completion date, February 2011) Rehabilitation of Streets, Phase 1 (aka IDIQ #2) Ena Rd, McCully St, Niu, Keoniana, Pau, Kuamoo, Kalaimoku st, Olohana st, Kalakaua Ave, Makee Rd, Cartwright Rd, Lemon Rd, Ohua Ave, Paoakalani Ave, Keolohilani Ave, Koa Ave, Prince Edward, Liliuokalani, Koa Ave, Kaiulani Ave, Lauula St, Seaside, Royal Hawaiian, Lewers, Helumoa Rd, Beachwalk, Paoa Pl, Kalia Rd, Saratoga Rd, Waimami Way, Kaneloa Pl, Ainakea Way, Pualani Way, Paoakalani Ave, Mountain View, Tusitala, Kapuni, Kapili, Kaiulnai Ave, Kanekapolei St, Walina St, Nahua St, Nohonani St, Aloha Dr, Seaside, Kaiolu, Laniu, Kalaimoku, Olohana, Namahana, Kalaimoku WAIPAHU Rehabilitation of Paiwa Street (Farrington Highway to Waipahu Street), Waipahu Street (Hianakiu Street to Kaupu Place), Makoa Street (Puia Street to end to end), Puia Street (Anonui Street to Eleu Street, and Heahea Street to deadend): Paving completed. Punch list for manhole adjustment remaining. (Estimated completion date, February 2011) PARADES, WALKS, RACES AND OTHER STREET CLOSURES February 21, 2011 Monday 6:45AM Starts 11:00AM Ends | KAISER PERMANENTE GREAT ALOHA RUN sponsored by Kaiser Permanente/Carole Kai Charities. The event is expected to have 22,000+ runners. It will start on Nimitz Hwy. at Nuuanu Ave., to Nimitz Hwy., ewa bound, to Kamehameha Hwy then under the H-1 viaduct, to Kamehameha Hwy., to Aloha Stadium service road into the main gate of Aloha Stadium, to finish in the north end zone of Aloha Stadium. Contact: Carol Jaxon 528-7388, Fax: 528-7392 For more info, visit their website: http://www.greataloharun.com/ | February 23, 2011 Wednesday 8:30AM Starts 10:00AM Ends | WAIPAHU ELEMENTARY SCHOOL DRUG FREE WALK sponsored by Waipahu Elem. School. The event is expected to have 1,000 participants. It will start at Waipahu Elem. School on Waikele Rd., to Pupupuhi St., to Pupukahi St., to Farrington Hwy., to Pupupuhi St., to Waikele Rd., to finish at Waipahu Elem. School. Contact Rochelle Kalili 675-0150 ext. 305 Fax: 675-0121 | - 30 - Contact: Department of Design and Construction, Civil Design Division, Construction Management - 768-8839, Wastewater Management Division, Construction Management - 768-8794, Department of Transportation Services, TST Division 768-8391. |