| ||||
You are here: Main / Customer Services / Public Communications Division / 2014 / 11/21/14 Traffic Advisory: Lane closures for Honolulu rail transit project | ||||
November 21, 2014 Traffic Advisory: Lane closures for Honolulu rail transit project The Honolulu Authority for Rapid Transportation (HART) would like to inform drivers about lane closures for the week of November 23-29 as related to design and construction work for the Honolulu rail transit project. Motorists are advised that work along the 20-mile rail route from East Kapolei to Ala Moana Center will require lane closures during non-peak traffic hours. For the safety of both the work crews and motorists, the public is advised to proceed with caution through these areas. Drivers should anticipate possible traffic delays or use alternate routes during work hours, and provide a safe distance between their vehicles and workers and equipment. EAST KAPOLEI/EWA (FARRINGTON HIGHWAY) Seven days a week through the end of January 2015 Kualakai Parkway (North-South Road) to Old Fort Weaver Road Farrington Highway between Kualakai Parkway (North-South Road) and Old Fort Weaver Road Loop is closed in both directions through January 2015 for utility relocation and column work. Drivers travelling between East Kapolei and the Ewa/Waipahu region will still be able to access either side by using either the H-1 Freeway on the north end of Kualakai Parkway, or Kapolei Parkway/Geiger Road on the south end. Keahumoa Parkway in East Kapolei One eastbound lane of Keahumoa Parkway is closed 24 hours a day, seven days a week. H-1 FREEWAY WAIAWA INTERCHANGE Sunday through Wednesday between 8 p.m. and 4 a.m. No work scheduled on Thanksgiving, Thursday, November 27 and Friday, November 28. H-1/H-2 Freeways near Leeward Community College Two southbound lanes of the H-2 Freeway approaching the Waiawa Interchange (H-1/H-2 merge) are closed overnight. Construction of the rail guideway crossing the H-1 Freeway is scheduled to run until mid-2016. WAIPAHU (FARRINGTON HIGHWAY) Monday through Wednesday lane closures. No work scheduled on Thanksgiving, Thursday, November 27 and Friday, November 28. Leoku Street to Leokane Street One eastbound left-turn lane from Farrington Highway onto Leoku Street and the left-turn lane from Farrington Highway onto Leokane Street remains closed 24/7 until the end of the year. The outside lanes of Farrington Highway near the Kunia Road overpass and the northbound lane of Leoku Street are closed weeknights from 7 p.m. to 6 a.m. The eastbound lanes of Farrington Highway between Leoku and Leokane streets are also closed between 7 p.m. and 6 a.m. Work in the area is scheduled to run through 2015. Leokane Street to Pupukahi Street The outside lanes of Farrington Highway and the northbound lane of Pupukahi Street are closed weeknights between 7 p.m. and 6 a.m. Work in the area is scheduled to run through 2015. Mokuola Street to Kahualii Street
PEARL CITY (KAMEHAMEHA HIGHWAY) Monday through Wednesday lane closures. No work scheduled on Thanksgiving, Thursday, November 27 and Friday, November 28. Various sections along the outside lanes of Kamehameha Highway in Pearl City and Aiea in both directions are closed weekdays for overhead utility work between 7 a.m. and 3:30 p.m. Waiawa Road to Waimano Home Road
Puu Poni Street to Kaonohi Street
AIEA/ALOHA STADIUM (KAMEHAMEHA HIGHWAY) Monday through Wednesday lane closures. No work scheduled on Thanksgiving, Thursday, November 27 and Friday, November 28. Utility work in area to run until end of 2014. Lipoa Place to Pali Momi Street
Pali Momi Street to Honomanu Street
Near Aloha Stadium
For updates on work days and times, visit the project website at www.honolulutransit.org or contact our hotline at 566-2299. -END- Media Contact: Scott Ishikawa. (808) 768-6172. cell: (808) 227-2350. |
No comments:
Post a Comment