You are here: Main / Customer Services / Public Communications Division / 2014 / 09/19/14 Road Work Weekly Report | ||||
September 19, 2014 Scheduled road work for the week beginning September 21 for the Department of Design and Construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below. Road work is normally done between the hours of 8:30 a.m. and 3:30 p.m. unless otherwise noted. EWA BEACH Rehabilitation of Localized Streets, Phase 7B Ewa Village Alaiki St, Ala Loa St, Alana St, Alanui Mauka Pl, Alanui Mauka St, Auwaha St, Bond St, Bryan St, Burke St, Ekemauu St, Halolani St, Hapaiko St, Garton St, Halemano St, Hapua St, Hei Pl, Hookahe Pl, Hoopio St, Hulili St, Imelda St, Kamahoi St, Karayan St, Kikoo St, Kuali St, Kuapuu St, Kupeleko Pl, Kuuwelu Pl, Lako St, Lauo St, Lehu St, Luahine St, Luluka St, Lunanui St, Mahamoe St, Malako St, Maliko St, Miula St, Nale St, Niulelo Pl, Oha St, Olehala St, Oohao St, Orrick St, Paaniana St, Paeheulu St, Paekii St, Paeko St, Pahe St, Paheahea St, Pahika St, Park Row, Pepper Row, Pihi St, Pipeline St, Pohakulepo St, Pualoalo Pl, Pualu St, Puhiko St, Punako St, Puuhala St, Sisal St, Tenney St, Uluhui St and Wili St. Project includes: cold planning; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas identified by the contractor and confirmed by the City; adjustment of utility manhole frames and covers, and street survey monument frame and covers; installation of pavement markers, striping and markings; installation of vehicle detector loops; locating existing manholes, valve boxes, monuments, etc. with GPS survey equipment and providing ArcGIS data files to City Dept. of Planning and Permitting in required data format. Paving complete. Adjusting manholes and placing permanent striping on various streets is on going. Varona Village area will be included. HAWAII KAI Hanapepe Loop Drain Outfall Improvements: Demolish and reconstruct existing concrete outlet structure, provide BMP devices, restore area to pre-construction; (Estimated completion date, September 2014) Rehabilitation of Localized Streets, Phase 11B (Kuliouou, Hahaione, Mariner's Ridge): The work includes localized reconstruction of pavement and resurfacing of the streets indicated below; reconstruction of identified curbs and gutters are included; tree trimming, pruning and removal will be performed as necessary under the guidance of qualified arborist. Post paving activities include installation of detector loops, permanent pavement markings and adjustment of utility manhole frames and covers to grade. The affected roadways and limits of work are as follows: AFFECTED ROADWAY FROM TO Aimoku Street Kuliouou Road Lani Street Ainahou Street Hawaii Kai Drive End Ainapo Place Ainapo Street End Ainapo Street Waika Place end Pepeekeo Street Awini Place Kawaihae Street End Apua Place Hawaii Kai Drive End Awini Way Awini Place End Bay Street Kalanianaole Hwy Summer Street Dalene Way Kuliouou Road Kawekiu Place Ehu Wai Place Hawaii Kai Drive End Elelupe Place Elelupe Street End Hahaione Place Hahaione Street End Hahaione Street Hawaii Kai Drive Mauka End Hakalau Place Kawaihae Street End Haleloa Place Kuliouou Road End Hapuna Place Hawaii Kai Drive End Hoehoe Place Kuliouou Road End Hokiokio Place Kuliouou Road End Hokulani Street Ainapo Street End Kaahue Street Kaluanui Road Kaluanui Road Kaakaaniu Street Kaluanui Road End Kaalula Place Kaluanui Road End Kaekeeke Way Puili Place End Kaeleloi Place Kuliouou Road End Kahauloa Place Kaluanui Road End Kahena Place Kahena Street End Kahena Street Hahaione Street Makai End Kahinu Street Aimoku Street End Kahuwai Place Kaluanui Road End Kailiu Place Kaluanui Road End Kaiolohia Place Ainahou Street End Kaiolohia Way Kaiolohia Pl End Kaipuhaa Place Kaluanui Road End Kaiwiki Place Hawaii Kai Drive End Kakapa Place Kaluanui Road End Kakiwa Place Kaluanui Road End Kalaau Place Kuliouou Road End Kalahu Place Kaluanui Road End Kalihiwai Place Kaluanui Road End Kaloaloa Street Kaluanui Road Kaahue Street Kalopa Street Ainapo Street Kii Street Kaluaa Place Kaumoku Street End Kaluanui Place Kaluanui Road Kaluanui Way Kaluanui Way End End Kamoi Place Kaahue Street End Kamookoa Place Kaluanui Road End Kanakou Place Kaluanui Road End Kaniela Place Kuliouou Road End Kanoenoe Street Hawaii Kai Drive Makaa Street Kaohe Place Kaahue Street End Kaoopulu Place Kaluanui Road End Kaoopulu Way Kaoopulu Place End Kapa Place Kaluanui Road End Kapalapala Place Hawaii Kai Drive End Kapapala Place Kaahue Street End Kapoho Place Kaahue Street End Kapulena Loop Kii Street Kii Street Kauhola Place Hawaii Kai Drive End Kauku Place Kaahue Street End Kaumoku Street End End Kauna Street Ainapo Street Kii Street Kaupaku Place Kaluanui Road End Kaupalena Street Kuliouou Road Lani Street Kawaihae Place Kawaihae Street End Kawaihae Street Kalanianaole Hwy Hawaii Kai Drive Kawaiki Place Kaahue Street End Kawekiu Place Kuliouou Road End Keokea Place Kawaihae Street End Keoki Place Kuliouou Road End Kii Place Kii Street End Kii Street Ainapo Street End Kuaehu Place End End Kuaehu Street Makaa Street Kuaehu Place Kukuau Place Ainapo Street End Kulani Street Ainapo Street End Kuliouou Place Kuliouou Road End Kumukahi Place Hawaii Kai Drive End Lani Street Kaupalena Street Aimoku Street Makaa Place Makaa Street End Makaa Street Hawaii Kai Drive End Makaniolu Place Maunalua Avenue End Manukapu Place Kuliouou Road End Maunalua Avenue May Way End May Way Kawaihae Street End Milolii Place Kawaihae Street End Naleialoha Place Kuliouou Road End Nana Honua Street Hahaione Street End Niuiki Circle Kalanianaole Hwy Kalanianaole Hwy Oeoe Way Puili Place End Onohi Street Hawaii Kai Drive Makaa Street Ookala Place Hawaii Kai Drive End Opihikao Place Hawaii Kai Drive Private Gate Paauilo Place Hawaii Kai Drive End Paeoki Drive Summer Street Kalanianaole Hwy Pahukula Place Kuliouou Road End Pahupai Way Puili Place End Papahehi Place Kuliouou Road End Pepeekeo Place Pepeekeo Street End Pepeekeo Street Hawaii Kai Drive Hahaione Street Pila Place Kuliouou Road End Pohoiki Place Hawaii Kai Drive End Puakea Place Hawaii Kai Drive End Puili Place Kuliouou Road End Pukoo Place Pukoo Street End Pukoo Street Hahaione Street End Puuomao Place Puuomao Street End Puuomao Street Uwao Street End Summer Street Maunalua Ave End Upolo Place Hawaii Kai Drive End Uwao Street Hahaione Street Nana Honua Street Waika Place Ainapo Street End Wakine Place Kuliouou Road End
(Estimated completion date, May 2015) HONOLULU Airport Sewer Rehabilitation / Reconstruction, Phase 2 CIPP rehabilitation of 36" sewer lines along Aolele Street, from Rodgers Blvd to Lagoon Drive. (Estimated completion date, continuing through December 2014) Ala Moana Blvd./Auahi Street Sewer Rehab, Phase 2 Rehabilitation of approx. 1,980 LF of existing 6'x6' box sewer along Auahi Street from Kamani Street to Keawe Street including relocation of existing waterlines; installation of 210LF of new 6" sewer line at 711 Ala Moana Blvd.; and rehabilitation of existing concrete manholes including abandonment of existing 36" sewer line along Ala Moana Blvd. (Estimated completion date, continuing through September 2014) Rehabilitation of Streets, Unit 64-R Beretania Street, University Avenue to Alapai Street: The project will remove the underlying concrete bed then reconstruct and resurface Beretania Street from University Avenue to Alapai Street with 3-inches of HDOT IV over 6-inches of Asphalt Concrete Base (ACB). The work also includes removing asphalt overlay in existing gutters; reconstruction of designated curbs, gutters, driveways and thru-gutters; construction of new curb ramps; demolish unused and construct new concrete bus pads; construction of a new grated inlet and drain line; coordinating and performing tree canopy trimming, root pruning and tree removal as necessary under the guidance of certified/qualified arborist. Also, included will be the adjustment of existing utilities to grade; installation of permanent pavement markings; and restoration of the traffic loop sensors. (Estimated Completion July 2015) Mapunapuna Industrial Subdivision Phase One of Tidal Flooding Remediation Program: Remove existing flap gates and install new check valves at outlet pipes in State channel fronting Kam Highway. Construct new DMH upstream of new check valves. Re-grade swale and adjust existing D.I. frame / cover to provide positive runoff flow into existing Drain system. Reconstruct concrete wall at outlet pipes at State channel. Remove debris and sediment from existing storm drains and channel area. Dewater State channel and install temporary dewatering dams. Restore existing chain link fence at outlet area. At the intersection of Ahua Street and Awaawaloa Street, provide permanent concrete plug in existing 24" DL. Drain inlet protection and site restoration at outlet in progress. (Estimated completion, continuing through September 2014) Rehabilitation of Streets, Unit 66 Oahu Avenue, Kapahulu Avenue & Atkinson Drive: The project will reconstruct and resurface the above streets with varying thicknesses of Asphalt Concrete Base, City & County Mix 4 or State Mix IV. The work includes removing asphalt overlay in existing gutters; reconstruction of designated curbs, gutters and sidewalks; construction of new concrete and asphalt bus pads; catch basin repairs; coordinating and performing trimming tree canopies, root pruning and tree removal as necessary under the guidance of certified/qualified arborist. Also, included will be the adjustment of existing utilities to grade, and permanent pavement markings; and restoration of the traffic loop sensors. (Estimated Completion August 2015) Palani Avenue Drainage Improvements Installation of drainage pipes, drainage structures, and check valves within Date Street and Palani Avenue. (Estimated completion date, continuing through September 2014) Rock Slide Potential Inspection and Mitigative Improvements along Prospect Street The work includes clearing and grubbing ; excavating ; installing rockfall impact barrier systems ; installing concrete barriers ; installing draped wire mesh systems ; traffic control ; and tree removal. (Estimated completion date, December 2014) Rehabilitation of Localized Streets, Phase 11A (Waialae Nui, Waialae Iki, Aina Haina): The work includes localized reconstruction of pavement and resurfacing of the streets indicated below; reconstruction of identified curbs and gutters are included; tree trimming, pruning and removal will be performed as necessary under the guidance of qualified arborist. Post paving activities include installation of detector loops, permanent pavement markings and adjustment of utility manhole frames and covers to grade. The affected roadways and limits of work are as follows: ROADWAY FROM TO Aha Aina Place Halekoa Drive End Aha Maka Way Aha Aina Place End Aha Niu Place Halekoa Drive End Ahaana Way Aha Aina Place End Ahaku Place Halekoa Drive End Ahamele Place Halekoa Drive Dead End Ahapii Place Halekoa Drive End Aholehole Street Lawelawe Street Hind Iuka Drive Ahuawa Loop Kilauea Avenue Kilauea Avenue Ahuawa Place Ahuawa Loop End Ahuwale Place Ahuwale Street End Ahuwale Street Hao Street Hao Street Ailuna Street Hind Iuka Street End Akiaki Place Kilauea Avenue End Alaeloa Place Halekoa Drive End Alaeloa Street Halaeloa Drive (Makai) Halekoa Drive (Mauka) Alahee Street Lawelawe Street Hind Iuka Drive Alakoa Street Malia Street Makaikoa Street Alamuku Street Hind Iuka Street Ailuna Street Alaweo Place Alaweo Street End Alaweo Street Laukahi Street Koko Head End Aliikoa Street End End Analii Place Analii Street End Analii Street Kalanianaole Highway Laukahi Street Ani Street Hao Street Hind Iuka Drive Ani Street Bridge Bridge Ehupua Place Ohialoke Street End Ehupua Street Ohialoke Street Laukahi Street Ekoa Place Mona Street End Ekoa Place Mona Street End Halapepe Street Lawelawe Street Leighton Street End Halehaka Street Halekoa Drive Halekoa Drive Halekoa Drive Ainakoa Avenue Makai End Halekoa Place Halekoa Drive End Hawane Place Laukahi Street End Hema Place Hao Street End of concrete Hiikala Place Oili Loop End Hind Place East Hind Drive End Hoaaina Place Hoaaina Street End Hoaaina Street Laukahi Street Ihiloa Loop Hoakoa Place Malia Street End Hoana Street Opihi Street Concrete Road Section Honokoa Place Ainakoa Avenue End Hunakai Street Waialae Avenue Keanu Street Hunakai Street Keanu Street Kilauea Avenue (Mauka) Ihiloa Loop Laukahi Street Laukahi Street Ihiloa Place Ihiloa Loop End Iki Place Kalanianaole Highway End Ipukula Street Kamole Street Kamole Street Iuka Place Hind Iuka Street End Kaai Street Keikilani Circle Kalanianaole Highway Kaimoku Place Kaimoku Way End Kaimoku Way Kalanianaole Highway End Kainoa Place Mona Street End Kalaniiki Place Kalaniiki Street End Kalaniiki Street Kalanianaole Highway Private Gate Kamole Place Kamole Street End Kamole Street Laukahi Street Loop Keakealani Street Hao Street Kiholo Street Keanu Street Hunakai Street Hunakai Street Keikilani Circle Kaai Street Kaai Street Kiai Place Poola Street End Kihi Street Laukahi Street Kumakani Street Kilauea Avenue Hunakai Street End Kilauea Place Kilauea Avenue End Kimokeo Street Lawelawe Street to Hind Iuka Drive Kirkwood Street Papai Street Kalanianaole Highway Kuhilani Street Laukahi Street Kamole Street Kului Place Leighton Street End Laamia Street Laukahi Street Ohialoke Street Lalea Place Laukahi Street End Laukahi Place Laukahi Street End Lawelawe Place Lawelawe Street End Lawelawe Street Manauwea Street Hind Iuka Drive Leighton Street Halapepe Street Ailuna Street Lihipali Place Halekoa Drive End Limu Place East Hind Drive End Liwai Street Kiholo Street Hao Street Makaikoa Street Malia Street End Makalena Street West Hind Drive End Malia Place Ainakoa Avenue Dead End Malu Place Kilauea Avenue End Manauwea Street East Hind Drive Lawelawe Street Manauwea Street Lawelawe Street End Nalulu Place Ihiloa Loop End Nenue Place Nenue Street End Nenue Street West Hind Drive Kalanianaole Highway Ohawai Place Ihiloa Loop End Ohialoke Street Laukahi Street Ihiloa Loop Oili Loop Kilauea Avenue Kilauea Avenue Oili Place Oili Loop End Olapa Street Lawelawe Street Hind Iuka Drive Palaau Street Laukahi Street Ihiloa Loop Palaole Place Poola Street End Palipaa Place Halekoa Drive End Panalea Place Poola Street End Paniolo Place Ailuna Street End Papai Street East Hind Drive (Makai) Kirkwood Street Pilikai Street Hao Street Kiholo Street Poola Place Poola Street End Poola Street Analii Street End (Private Gate) Puahia Place Poola Street End Uhi Place Halekoa Drive End Uhiuhi Street East Hind Drive Lawelawe Street Waa Street Poola Street Poola Street Wahinekoa Place Makaikoa Street End Waianiani Place Waiholo Street End Waieli Street Kalanianaole Highway Waiholo Street Waiholo Place Waiholo Street End Waiholo Street Waieli Street Kalanianaole Highway Waihou Street Kiholo Street Hao Street Waiiki Place Waiiki Street End Waiiki Street Waiholo Street Waiholo Street Waikui Place Waikui Street End Waikui Street Waili Street Kalanianaole Highway Waipahee Place Waiholo Street End (Estimated Completion January 2015) Wilder Avenue and Metcalf Street Sewer Rehabilitation Rehabilitation work of approximately 640 feet of 6" sewer along Wilder Avenue, between Metcalf Street and Evelyn Lane. One lane closure westbound Monday through Friday 8:30am 3:30pm. (Estimated completion date, continuing through July 2014) KAILUA Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 (Estimated completion date, continuing through September 2014) KAIMUKI Rehabilitation Of Streets, Unit 57 Kaimuki area The work includes reconstruction of pavement and resurfacing of streets; reconstruction of curbs, gutters, sidewalks, driveways and bus pads; tree trimming, root pruning and tree removal as necessary; pavement markings and markers, installation of vehicular detector loops, adjustment of street monuments to new finish grade, and adjustment / reconstruction of utility manhole / valve box frames and covers to new finish grade. The affected roadways and limits of work are as follows: Waialae Avenue from Kapahulu Avenue to 17th Avenue; 5th Avenue from Waialae Avenue to Harding Avenue; 6th Avenue from Harding Avenue to Pahoa Avenue; 7th Avenue from Waialae Avenue to Pahoa Avenue; 8th Avenue from Waialae Avenue to H-1 Freeway; 9th Avenue from Waialae Avenue to H-1 Freeway; 10th Avenue section crossing H-1 Freeway; 11th Avenue from Waialae Avenue to Harding Avenue; 12th Avenue from Waialae Avenue to H-1 Freeway; 13th Avenue from Keanu Street to Claudine Street; 14th Avenue from Waialae Avenue to Keanu Street; 15th Avenue from Waialae Avenue to Noeau Street; 16th Avenue from Waialae Avenue to end (mauka side); 17th Avenue H-1 Freeway to Noeau Street; and Moi Way, Anuhea Place, Ekaha Avenue, Hoku Avenue, Keanu Street, Noeau Street, Claudine Street, Koko Head Drive. (Estimated completion date, continuing through September 2014) KANEOHE Rehabilitation of Wailele Road Bridge Repair cracks in the abutment walls and bridge deck soffit; Repair delaminations and spalls along the bridge deck soffit and along the abutment walls; Remove existing deteriorated pre-molded joint filler along the base of the abutment walls and installing new joint filler and sealant; Repair cracks in the channel lining slab; Repair spalls in the concrete railing beam and posts; Repair or replace corroded reinforcing steel bars at cracks, spalls and delaminations; Provide grouted rubble paving (GRP) toe protection to the existing cement rubble masonry (CRM) channel walls downstream of the bridge; Provide GRP scour protection along the existing downstream cut-off wall of the channel invert slab; Fill a hole in a low CRM; Increasing the height of the bridge rail; Constructing a concrete curb below the existing concrete rail. (Estimated completion date, April 2015) MAILI Maili Stream Access Ramp Scope of work: Installation of an approximately 80-foot long concrete access ramp and retaining walls to provide access to the Maili channel east of Maliona Street (Estimated completion date, September 2014) MILILANI Rehabilitation of Streets Indefinite Delivery/Indefinite Quantity IDIQ #3 Aelike Pl, Aelike St, Ahahuina Pl, Ahea Pl, Ahea St, Ahikao St, Ahohui St, Ahokele St, Ahulili St, Ailona St, Ainakuai Pl, Ainamakua Dr, Ainana Pl, Ainana Way, Akaluli St, Akeake St, Alakaina St, Alaoki Pl, Alaoki St, Alaume Pl, Alaume St, Alenale Pl, Anuanu St, Aoakua St, Auina Pl, Auina St, Haakualiki Pl, Haakualiki St, Haike Pl, Hakala St, Halehaku Pl, Halekua St, Haike Pl, Hakala St, Halehaku Pl, Halekua St, Halelau Pl, Haloku Pl, Haloku St, Hoahiahi Pl, Hoahui St, Hoailona Pl, Hoailona St, Hoakua Pl, Hoaluhi Pl, Hoani Pl, Holokia Pl, Hololani St, Hololea St, Hookaau St, Hookanahe St, Hookowa Pl, Hookowa St, Hookupu St, Hoomua St, Hooni Pl, Hoonui Pl, Iimi Pl, Kaapeha St, Kahanui St, Kahele Pl, Kahele St, Kahonua St, Kahualea St, Kailewa St, Kamalino St, Kanae St, Koliliko St, Konaku St, Koolua Pl, Koolua Way, Kopalani St, Kowa St, Kuahaua Pl, Kuahewa St, Kuanoni Pl, Kuanoni Way, Kuaoa St, Kuauli St, Kuauna Pl, Kuena St, Kuhea St, Kuikepa Pl, Kuinehe Pl, Kukini Pl, Lahui Pl, Lahui St, Lapaiki St, Lauae St, Lehiwa Dr, Liho St, Lilii Pl, Luaehu Pl, Luaehu St, Makaikai Pl, Makaikai St, Malielie Pl, Malielie St, Meahou St, Meanui St, Milia Pl, Milia St, Mua Pl, Naaualii Pl, Ohi St, Oliliko St, Paea St, Paeli Pl, Pakau St, Puakai Pl, Puneki Pl, Puneki St, Puneki Way, Puulu St, Ulahea Pl, Ulahea St, Ululele Pl: The scope of work to be performed by the Contractor under this contract may include, but is not limited to: cold planning; slurry seal; crack seal; reconstructing curb and gutters/rolled curbs; resetting of lava rock curbs; arboricultural work; adjusting street survey monuments, utility manholes/boxes, frames and covers; installing pavement striping and markings; and reinstalling vehicle detector loops. Slurry sealing Haloku St, Ahulili St, Kukini Pl, Kuinehe Pl, Ahokele St and Kuaoa St. Permanent striping to follow. (Estimated completion date, continuing through September 2014) Rehabilitation of Streets, Unit 68 (Meheula Parkway and Anania Drive): The work includes reconstruction and resurfacing of the asphalt roadway; reconstruction of identified curbs and gutters; tree trimming, pruning and removal will be performed as necessary under the guidance of qualified arborist; post paving activities include permanent pavement markings; adjustment of utility manhole frames and covers to grade and reinstallation of traffic loop detectors. (Estimated completion date, December 2014) MOANALUA Moanalua Stream Lining Reconstruction The work includes removal of trees, debris, concrete structures, existing concrete within the channel; repairing and/or patching concrete invert and side slopes; routing and repairing existing cracks in concrete; installing turf matting; and replacing debris stanchions. (Estimated completion date, April 2015) PUPUKEA Pupukea Road Rockfall Mitigation Phase II: The work consists of clearing vegetation within the project limits, scaling boulders and unstable rocks or installing rock dowels (where appropriate), applying shotcrete (where required), installing rock fall protection fences, drapery system and landscaping. One traffic lane will be closed during work hours at Pupukea Road with police performing traffic control duties. (Estimated completion date, September 2014) WAIAU Waiau Area Sewer Rehabilitation/Reconstruction Kuleana Place, Kaulike Drive, Kauhihau Place, and Hile Place: Excavation and replacement of approx. 728LF of 8" sewer main including reconnection of existing sewer laterals; installation of new sewer manholes and rehabilitation of existing sewer manholes; and restoration of existing asphalt pavements, driveways, sidewalks, and curbs. (Estimated completion date, continuing through September 2014) Beachwalk Force Main Phase I: 2 Staging pits to be constructed along (Estimated completion date, continuing through September 2014) Waikiki Sewers Rehabilitation/Reconstruction: Installation of cured in place pipe (CIPP), manhole rehabilitation, and lateral rehabilitation along Kuhio Avenue between Namahana Street Kapuni Street. (Estimated completion date, continuing through September 2014) WAIMALU Waimalu Stream Maintenance Dredging Project consists of maintenance dredging of accumulated sediment in Waimalu Stream and Punanani Channel. Dredged material will be disposed of at designated ocean disposal site and upland location. (Estimated completion date, continuing through September 2014) WAIPIO Rehabilitation of Streets, Unit 47, Waipio The work includes reconstruction of pavement and resurfacing of streets; reconstruction of curbs, gutters, tree trimming, root pruning and tree removal as necessary; pavement markings and markers, restoration of vehicular detector loops, adjustment of street monuments to new finish grade, and adjustment / reconstruction of utility manhole / valve box frames and covers to finish grade. The affected roadways and limits of work are as follows: Ka Uka Boulevard, Ukee Street, Waipio Uka Street, Moaniani Street, Lumikula Street, Kuala Street (Waiawa), Acacia Road (Waiawa) (Estimated completion date, December 2014) VARIOUS LOCATIONS NTP 4/28/14. ELECTRICAL WORK IN PROGRESS Curb Ramps at Various Locations: Demolition, removal and disposal of existing pavements, curbs, gutters, sidewalks, curb ramps; Construction of new sidewalks, curb ramps, and curbs and/or gutters, thru gutters, and top soil with landscape grassing; Reconstruction of pavement transitions with City Mix #4 Asphalt Concrete Pavement and Asphalt Concrete Base; Adjustment of handholes, and all other box frames and covers on all sidewalks being reconstructed; Restoration of all pavement striping, markings and markers; Relocation of/additions to traffic signal systems and/or pedestrian push buttons; Tree and root trimming and pruning, as necessary; Relocation of street light standards, pullboxes and ductlines; (Estimated completion date, February 2015) PARADES, WALKS, RACES AND OTHER STREET CLOSURES
Contact: Department of Design and Construction, Civil Design Division, Construction Management - 768-8839, Wastewater Management Division, Construction Management - 768-8794, Department of Transportation Services, TST Division 768-8391. | ||||||||||||||||
No comments:
Post a Comment